Prior to the first measurement flight an EMC-test is scheduled to ensure e.g. that no measurement instrument on the aircraft interferes with the aircraft electronics. For this purpose the Geophysica is rolled out together with all measurement instruments, engines of the aircraft and the instruments are switched on and the electromagnetic field around the aircraft and at the cockpit control is measured. During flight and the actual EMC test, only with running engines the instruments can draw current for operation. For yesterday, this EMC test was scheduled, and the aircraft together with all instruments were ready to be tested (see picture), but the airport tower did not approve the start of the engines. Today the EMC-test was also not possible so that it is now planned to be carried out tomorrow (July 26th).
Some equipment did not reach the campaign site on time and is still missing. The earliest arrival of this equipment is estimated to be tomorrow (July 26th). Before the equipment arrives, no measurement flight can take place. This (but also the delayed EMC-test) delays the campaign phase. The official campaign ending is scheduled for August 14th, but a possible shift of this date by a few days is currently discussed.
However, the biggest step for the startof the campaign was the arrival of the research aircraft Geophysica. Here are some spectacular pictures of the Geophysica landing in Kathmandu from July 20th at 6:13 a.m. local time:
The colleagues in Kathmandu found some time to explore the region
… and the view from the hotel is also not bad
No Comments
Be the first to start a conversation